China Resources Land Longfor 1st Avenue Orderly Charging Project
2024-09-29
124

Cooperation mode: equipment supply + solution 

Project introduction: The orderly charging project of the underground parking lot of Longfor 1st Avenue has a distribution capacity of only 80kVA, including 150 sets of 3.5kW AC piles. The orderly charging scheme is adopted on site, and power distribution mode is flexibly adjusted to avoid on-site expansion. The deployment scheme of cloud + terminal is adopted, and the orderly charging management & control terminal is used as the edge computing center, so as to realize the localization of orderly charging control, faster response speed, lower networking cost and less network traffic. 

(Representative product: AC220V AC wall-mounted 3.5 kW charging pile).