Cooperation mode: equipment supply
Project introduction: Since 2016, State Grid Corporation has invited bids for 19 times (nearly 100 bidding enterprises), and CYG has won the bid for 14 times, totaling more than 4,000 sets of AC/DC charging equipment, with its products covering Beijing, Shanghai, Hebei, Jiangxi, Jiangsu, Chongqing, Sichuan, Zhejiang, Liaoning, Hubei, Fujian and other provinces and cities; In November 2017, CYG won the bid for the State Grid Xiong'an New Area Project; In October 2018, a total of 32 AC charging piles in the charging station of the Great Hall of the People have been put into operation.
(Representative products: DC 120kW, DC 60kW, AC 42kW, AC 7kW)